Objectives Modular shipbuilding can shorten the cycle of design and construction, lower production costs and improve the quality of products, but higher shipbuilding capabilities are required, especially for the installation of power plants. Because of such characteristics of modular shipbuilding as the high precision of docking links, long size equipment installation chain and quantitative docking interfaces, docking installation is very difficult due to high docking deviation and low accuracy of docking installation, leading to the abnormal vibration of equipment. In order to solve this problem,
Methods on the basis of domestic shipbuilding capability, numerical calculation methods are used to analyze the accuracy distribution of modular installation.
Results The results show that the accuracy distribution of different docking links is reasonable and feasible, and the setting of adjusting allowance matches the requirements of shipbuilding.
Conclusions This method provides a reference for the modular construction of marine power plants.